Conveyor engineering planning, design, manufacturing, construction, maintenance, turnkey | |
Coking equipment production and installation of (including coking vehicles, coke oven castings, and coke oven iron parts) | |
Stacker reclaimer planning, design, production and installation |
Owner: | China Steel Corporation |
---|---|
Name: | Project for Phase 1 Installation of Conveyor System of the Indoor Coal Yard |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2021.12 |
Scope of Work: | 1.Reformed the work flow of the conveyor system, including engineering in civil, steel structure, machinery, instrument and electricity, fire protection, piping; 2.Carried out the trial run test and performance test jointly with the owner; 3.Delivered loading data and analysis; applied and obtained the crane certification. |
Features: | Coals were conveyed from the vessels to the storage yard, and then conveyed from the storage yard, through the SCR, towards further treatment. |
Owner: | Dragon Steel Corporation |
---|---|
Name: | Project for Wind and Dust Prevention Improvement of Raw Material Storage Yard |
Location: | Taichung, Taiwan |
Date of Completion: | 2021.12 |
Scope of Work: | Planning, manufacture and installation of conveyor handling system |
Features: | Indoorization of the storage yard lowered the environmental costs, improved the quality of material, enhanced the overall efficiency through automation. |
Owner: | Dragon Steel Corporation |
---|---|
Name: | Stage 2, Phase 2, Manufacture and Installation Project of Charging Cars, Coke Guiding Cars, and Instrument and Electrical Equipment |
Location: | Taichung, Taiwan0 |
Date of Completion: | 2012.08 |
Scope of Work: | Procurement of electromechanical equipment, prefabrication, on site installation and commissioning |
Features: | Installed coke guiding cars( manufactured 231tons, procured 261tons) Installed charging cars(manufactured 194tons, procured 240tons) |
Owner: | Dragon Steel Corporation |
---|---|
Name: | Stage 2, Phase 2, Raw Material Conveyor Handling System (West Zone) |
Location: | Taichung, Taiwan |
Date of Completion: | 2013.01 |
Scope of Work: | Manufactured the transferring tower, reclaimer, stacker, installed the plough feeder, rod mill and conducted trial run test |
Features: | 71 belt conveyors, 9 extended belt conveyor, ranged 11,426Km; 34 transferring towers |