Owner: | China Steel Corporation |
---|---|
Name: | Civil Foundation Engineering Project for Additional Temporary Storage Tank of the Coking Wastewater |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2020.12 |
Scope of Work: | Civil design and construction; closed reinforced concrete pool with length 31M, width 27.6M, height 10.2M; bored precast concrete piles, railings, stairs, pipelines |
Features: | The building was over 856 square meters and the height was 10m. It was categorized as Category D, Hazardous Working Place. Bracing for formwork was needed for stability and alignment when strong winds hit. |
Owner: | Dragon Steel Corporation (DSC) |
---|---|
Name: | Civil Construction Project for the Electrical Rooms #2 of Central Water Plant |
Location: | Taichung, Taiwan |
Date of Completion: | 2020.06 |
Scope of Work: | Included civil design and construction; a three-story reinforced concrete building used as the electrical room; constructed a cross-road pipe bridge to connect the west side of the second electrical room; indoor weak current; air-conditioning equipment; water supply and fire-fighting water pipelines. |
Features: | Demolished the existing plant and constructed a new electrical room. The existing facilities nearby were still operating and could interfere with ongoing construction. Obstacles included, such as underground box culverts, cable wires, narrow construction space and routing. Adopting silent piler method made this project even more demanding. |
Owner: | Far Eastern Polytex (Vietnam) Ltd. |
---|---|
Name: | Civil Engineering Project of the FEPV Line and Product Storage Yard |
Location: | Binh Duong, Vietnam |
Date of Completion: | 2019.10 |
Scope of Work: | Civil engineering and construction |
Features: | Because this was a project for production plant, the equipment installation must coordinate with the civil construction process. And the project schedule must match the projected market demand. Due to the late delivery of owner's equipment, design and construction work was carried out almost simultaneously. Though Vietnam had adequate manpower, inefficiency made the project more challenging. |
Owner: | Far Eastern Polytex (Vietnam) Ltd. |
---|---|
Name: | Chemical Fiber Plant-Civil Engineering, Pipeline Design, Foundation Piles, Roads, floors, Rain Drainage, 100t Weight Station, etc. |
Location: | Binh Duong, Vietnam |
Date of Completion: | 2017.06 |
Scope of Work: | This project was for the civil design and foundation pile construction, including the construction of drill-driving foundation piles for the entire plant, the outdoor materials storage area and the RC floor of the container yard, the roads of the chemical fiber plant and the rain drainage system (including the site preparation for the road between the chemical fiber plant and the spinning mill, the underground wastewater discharge water system of the chemical fiber plant, the civil structure and facility for the weight station (100tons). |
Features: | The project in Binh Duong, Vietnam, involved local and international contractors working together. The culture difference and technology gap among subcontractors at many levels impacted the performance of this project and posed the real challenge to the management team. Also installation of a pile was demanding due to the reason that SPT-N Value of the soil in Binh Duong was above 40. Capacity of a basic equipment was insufficient. Moreover, the rainy season and wet weather in Vietnam made it harder to control project quality and progress. |