Machinery and equipment planning, specification issuance, procurement and construction | |
Basic design, detailed design and construction of pipelines | |
Basic design, detailed design and construction of tanks | |
Design of sludge scraper, cooling tower | |
Turnkey project of water treatment |
Owner: | Taiwan Water Corporation- Central Engineering Department |
---|---|
Name: | New Construction Project for Caotun Water Treatment Plan |
Location: | New Taipei City, Taiwan |
Date of Completion: | 2023.09 |
Scope of Work: | Whole plant civil structure, architecture, landscape, road engineering, electromechanical equipment engineering, single/combined trial run, performance test |
Features: | energy-saving and carbon-reducing equipment; detention basin planning; ecological assessment mechanism; “Earthwork Equilibrium” approach |
Owner: | Dragon Steel Corporation |
---|---|
Name: | New Construction Project for the Sludge Drying Equipment of Water Treatment |
Location: | Taichung, Taiwan |
Date of Completion: | 2021.04 |
Scope of Work: | Sludge Drying |
Features: | Processed 1.2 tons per day. Moisture content of the dry sludge treated: 35% ~ 40% Processed 500 tons of industrial wet sludge with a water content of 80% and 180 tons of biochemical sludge with a water content of 85% per month. |
Owner: | Far Eastern Polytex (Vietnam) Ltd. |
---|---|
Name: | EPC Project for the 4,000,000 tons PET of the Chemical Fiber Plant |
Location: | Binh Duong Province, Vietnam |
Date of Completion: | 2018.07 |
Scope of Work: | Detailed design, manufacture, installation, commissioning |
Features: | Civil engineering/steel structure engineering, mechanical engineering, tank manufacture and assembly, pipeline engineering, fire protection engineering, instrument electrics engineering, air conditioning engineering |
Owner: | Water Resources Department, New Taipei City Government |
---|---|
Name: | Sanying Water Resources Recycling Center Construction Project |
Location: | New Taipei City, Taiwan |
Date of Completion: | 2017.08 |
Scope of Work: | Preparation before the commence of work, construction, testing, the operation permit application services, single/combined trail run, pre-trail run maintenance/management/custody, trail run with waste water, performance test, supervision, EPA permit application services, O&M |
Features: | 1. First underground waste water treatment facility in Taiwan, formed part of an extensive recreational park. The aerial landscape shows a symbol of huddling parrots. 2. Located in Water Quality and Quantity Protection Areas of Banxin Water Supply Plant, the effluent must meet the corresponding standard. The amount of treated domestic wastewater is 28,000 tons/day. No sludge return liquors. 3. Decorated the façade with curve lines and ceramics tiles, the control center was also aimed for educating the public on the technical processes of the plant and raising awareness of water sustainability. |
Owner: | CHC Resources Corporation |
---|---|
Name: | Construction Project of Mechanical Equipment of BOF Slag Treatment Plant(Yanhai Rd) |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2013.05 |
Scope of Work: | Constructed line A- slag treatment, line B- slag modification, line C- AC raw material; procured and installed the handling system and the associated steel structures |
Features: | 1. Constructed steel structure platform, 45 steel structure stackers, in total 866 tons. 2. Procured and installed magnetic separator, horizontal vibrating screen, jaw crusher, cone crusher and vibrating screen 3. Processing material and volume: BOF plate material 40,000 tons/month, BOF traditional material 25,000 tons/month, Post-BOF slag 13,000 tons/month, BOF modified slag 26,000 tons/month, Blast Furnace slag 27,000 tons/month moon. |