Owner: | CSC SOLAR CORPORATION |
---|---|
Name: | PV Power Generation System Planning and Construction |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2022.12 |
Scope of Work: | Integrated planning and detailed design of the power system; related system design according to the site conditions; construction supervision; O&M; consultation |
Features: | Stable and efficient power generation; total solution services; systems design, installation and O&M |
Owner: | China Steel Corporation India Pvt. Ltd |
---|---|
Name: | Turnkey Project for the Substation of Cold Rolling Plant |
Location: | Gujarat, India |
Date of Completion: | 2013.12 |
Scope of Work: | Integrated planning and detailed design of the power system; related system design according to the site conditions; construction supervision; O&M; consultation |
Features: | VHV to high and low voltage engineering interface integration; the system planning, installation and O&M |
Owner: | C.S. Aluminium Corporation (CSAC) |
---|---|
Name: | 161KV Main Substation Project |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2013.04 |
Scope of Work: | Integrated planning and detailed design of the power system; related system design according to the site conditions; construction supervision; O&M; consultation |
Features: | VHV to high and low voltage engineering interface integration, the system planning, installation and O&M |
Owner: | Dragon Steel Corporation (DSC) |
---|---|
Name: | Plant Phase II Expansion Project for the Electromechanical Equipment |
Location: | Taichung, Taiwan |
Date of Completion: | 2009.12 |
Scope of Work: | EPC services of the control and instrument system, Yokogawa DCS system software and hardware planning and design |
Features: | EPC services of the control and instrument system |
Owner: | China Steel Corporation |
---|---|
Name: | W53 DCS System Renovation Project |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2009.12 |
Scope of Work: | Renovation of the DCS system of the first cold rolling water treatment plant and the first central water treatment plant |
Features: | PLC+HMI system upgraded to YOKOGAWA DCS system; survey of the use of the original; new system design, replacement, trial run and system operation test |
Owner: | Taiwan Water Company |
---|---|
Name: | Chengcheng Lake Advanced Water Purification Plant Construction Project |
Location: | Kaohsiung, Taiwan |
Date of Completion: | 2003.10 |
Scope of Work: | Planning, design, construction, test run and O&M of the instrument control system, the Siemens PCS7 DCS system adopted |