Project Name | Date of Completion | Construction Category |
---|---|---|
TG-9/TG-10 Construction Engineering Design Project for CSC Power Plant. | 2026.03 | Power Plant |
O&M of Photovoltaic Power Generation System for CSC Group. | 2024.03 | New Energy Project (Solar Energy, Wind Power, Biomass Coal, etc.) |
CSC #Phase 1&2 Coke Oven Revamping Project of Utility Pipelines. | 2023.02 | Mechanical Engineering |
CSC #Phase 1&2 Coke Oven Cooling Water Tower Revamping Project. | 2023.02 | Civil Engineering |
FEPV 60 DTY Plant of Civil Engineering Design and Service Project | 2022.06 | Civil Engineering |
Dragon Steel Refractory Furnace Lining Revamping Project (R01 Contract Containing Basic Oxygen Furnaces LD Integration of Construction and Materials). | 2022.05 | Refractory Engineering |
O&M of CSC Solid Raw Material Treatment Plant. | 2022.04 | Conveyor O&M |
Dust Collection Warehouse Roof Revamping Project in Dragon Steel. | 2022.02 | Steel Plant O&M |
Industrial Waste Resources Reclamation Project. | 2022 | Incinerator Engineering |
CSC Industrial Waste Resources Reclamation O&M. | 2022 | Incineration Plant O&M |
Turnkey Project of Hsin Yu Co-generation Plant. | 2022 | Power Plant |
FEPV POY Plant Expansion of Civil Design and Service Project. | 2021.12 | Civil Engineering |
CSC Power Plant Remove Project of Demining Water Tanks and Pumps. | 2021.11 | Mechanical Engineering |
Supply of CSC Water Treatment Chemicals for Power Plant. | 2021.09 | Water Treatment Chemicals |
Revamping Project for Roof of H4 Finished Product Warehouse in Dragon Steel. | 2021.09 | Steel Plant O&M |
Pipeline Revamping Project of Relief Valve on the West Side of Dragon Steel No. 2 Blast Furnace. | 2021.06 | Mechanical Engineering |
Manufacturing and Installation Project for Overhaul of CSC 2BFR3 Zone 6000. | 2021.05 | Steel Plant Overhaul Engineering |
CSC #Phase 1&2 Double-Line Project of Mixing Lines. | 2021.04 | Mechanical Engineering |
CSC O&M of Industrial Wastewater Purification Plant. | 2021.04 | Water Treatment Plant O&M |
Refractory Warehouse Roof Revamping Project in Dragon Steel. | 2021.03 | Steel Plant O&M |
CSC 2BFR3 Blast Furnaces Overhaul Refractory Construction and Materials Revamping Project. | 2021.01 | Refractory Engineering |
MEP Project of Additional Coking Waste Water Temporary Storage Tank in CSC Coking Plant. | 2020.12 | Water Treatment |
COD Removal Tank for Coking Wastewater in CSC Utilities. | 2020.12 | Water Treatment |
Conveyor System Improvement Project for Wind and dust proof walls in Dragon Steel Raw Material Storage Yard. | 2020.12 | Conveyor Engineering |
SDMS Utilities Installation Project. | 2020.12 | New Energy Project (Solar Energy, Wind Power, Biomass Coal, etc.) |
Dan Hai LRT DC Power Supply System Design, Equipment and AC/DC Installation Engineering Project. | 2020.12 | Instrument & Electrical Engineering |
CSC Coal and Iron Ore Conveyor Process Revamping Project. | 2020.06 | Conveyor Engineering |
Dragon Steel Refractory Furnace Lining Revamping Project Contract R02 (2018~2019). | 2020.05 | Refractory O&M |
FEPV POY Plant Expansion of Foundation Pile Construction Project. | 2020.01 | Civil Engineering |
Info Champ LF4 Refining Furnace Equipment Project (Power Distribution System). | 2018.07 | Instrument & Electrical Engineering |
FEPV Fiber and Cotton Plant of Pilling Project. | 2018.06 | Civil Engineering |
Supply of Water Treatment Chemicals for DSC Power Plant. | 2018.02 | Water Treatment Chemicals |
CSC No. 3&4 Sinters Overhaul Engineering Project. | 2018.02 | Steel Plant Overhaul Engineering |
CSMC Ammonia Nitrogen Reduction Reclamation Project of Discharged Water. | 2017.12 | Mechanical Engineering |
CSVC Mechanical and Electrical Engineering O&M Project 2016. | 2017.10 | Mechanical/Electrical O&M |
Mainland Water Diversion (Water Pipe) Project in Kinmen. | 2017.09 | Mechanical Engineering |
Main Substation Project of CSCC Carbon Material Production Plant. | 2017.06 | Instrument & Electrical Engineering |
CSC On-site Maintenance Project of Production Line. | 2017.04 | Steel Plant O&M |
Intech MDI/DPI/NS Construction Project. | 2016.09 | Pharmaceutical Engineering |
Digital Media Headquarters Lighting System Integration Project of Formosa TV. | 2016.08 | Instrument & Electrical Engineering |
MagnPower New Construction Project of Hard Magnetic Powder Plant. | 2016.04 | Mechanical Engineering |
S120D L60X Electrical Engineering Project of Corning Incorporated. | 2015.12 | Instrument & Electrical Engineering |
CECK Mechanical and Electrical Equipment Fabrication and Installation Engineering. | 2015.09 | Mechanical Engineering |
Vietnam Xinshun Wastewater Treatment Plant of Expansion Project-Equipment Procurement | 2015.03 | Water Treatment |
Medigen Vaccine Plant's Process Equipment Procurement and Utilities Engineering Project. | 2015.02 | Pharmaceutical Engineering |
SHS Modular Plant Construction Project in Indonesian. | 2014.11 | Pharmaceutical Engineering |
Reclamation of Electrical Engineering Project for Wastewater Treatment System of CCPC Shulin Plant. | 2014.10 | Water Treatment |
CSC No.3 Sinter Plant Exhaust Gas Desulfurization Improvement Project. | 2014.09 | Air Pollution Control |
Mechanical and Electrical Engineering Project of Dyna Rechi Corporation. | 2014.09 | Instrument & Electrical Engineering |
Manufacturing Project of Dry Quenching Equipment (CDQ) Boiler and Steam Turbine Unit in Dragon Steel. | 2014.05 | Power Plant |
Construction of Water Treatment Plant for Shuncheng No. 2 Industrial Park in Vietnam. | 2014.01 | Water Treatment |
CSVC Steel Plant Communication System Engineering Project. | 2013.12 | Instrument & Electrical Engineering |
HEB Pharmaceutical Construction Plant in Ilan. | 2013.11 | Pharmaceutical Engineering |
CSCI's Utilities Supply. | 2013.09 | Mechanical Engineering |
CSC No.4 Sinter Plant Exhaust Gas Desulfurization Improvement Project | 2013.08 | Air Pollution Control |
CSVC Cold Rolling Mill Installation and Piping Project. | 2013.06 | Mechanical Engineering |
Main Substation and Power System Engineering Project of CHS API Manufacturing Plant. | 2013.06 | Instrument & Electrical Engineering |
CSAC #Phase 2 Expansion of Utilities-Pipe Bridge Project. | 2013.05 | Mechanical Engineering |
Utilities Turnkey Project of CHS Chang-Bin API Plant. | 2013.04 | Mechanical Engineering |
CSC Pilot Plant for Producing Biomass Coal from Oil Palm Fruit Fiber in Malaysia. | 2013.04 | Mechanical Engineering |
Piping, Equipment Installation and Thermal Insulation and Cold Preservation Project of #Phase 2 By-product Factory in Dragon Steel. | 2012.12 | Mechanical Engineering |
Taita Chemical 40KT ABS Sewage Treatment Plant Design and Engineering Project. | 2012.12 | Water Treatment |
Electrical Engineering Project for High & Low Voltage Installation of Walsin Lihwa Stainless Steel Plant. | 2012.12 | Instrument & Electrical Engineering |
Hydropower and Fire Fighting System Engineering Project for Bionime Pharmaceutical Plant. | 2012.11 | Pharmaceutical Engineering |
Steel Structure Fabrication for Algeria Oman Fertilizer Project. | 2010.09 | Conveyor Engineering |