Mechanical Engineering
Building Information Modeling, BIM | |
PDMS Bonding Technologies | |
Piping Stress Analysis | |
Pipeline basic design, detailed design and construction |
Tank basic design, detailed design and construction | |
Detail design for flue gas | |
Sludge scraper design | |
Cooling tower design |
Professional equipment design | |
Project professional equipment arrangement and planning | |
Project construction management, PCM | |
Turnkey project of water treatment |
Instrument & Electrical Engineering
Power Systems
Planning and design of UHV substation (161kV/69kV/33kV) | |
Planning and design of high-voltage substation (11.4kV/22.8kV) | |
Power system planning, design and calculation for turnkey projects | |
Planning and design of solar power generation system |
Instrumentation System
PLC/HMI system software and hardware planning | |
DCS system software and hardware planning and design | |
EPC project of instrument control | |
Network and CCTV system planning and design |
Supervision and Maintenance
Project management | |
Fire prevention engineering | |
15~69KV high voltage cable terminator treatment and voltage endurance test | |
Online monitoring and diagnosis system |
Incineration Plants- Turnkey Solution and O&M
Project planning | |
Project BOP equipment specification development and procurement | |
BOP equipment planning |
Project construction management (PCM) | |
Main equipment manufacture and installation | |
Turnkey project for BOP equipment |
Air Pollution Control
Bag Filter Dust Collector
Planning and design of pulse dust collector | |
3D planning and design of bag dust collection | |
Equipment specification development and procurement | |
Project construction management (PCM) | |
Equipment manufacturing and commissioning | |
EPC turnkey project |
Flue Gas Desulfurization
System process design and planning | |
Numerical simulation of SCR flow field | |
Equipment specification development and procurement | |
Project construction management (PCM) | |
Equipment manufacturing and commissioning | |
EPC turnkey project |
Flue Gas Denitrification
System process design and planning | |
Numerical simulation of FGD flow field | |
Equipment specification development and procurement | |
Project construction management (PCM) | |
Equipment manufacturing and commissioning | |
EPC turnkey project |
Cogeneration Plant
Project planning and feasibility study analysis | |
Thermodynamic equilibrium analysis | |
Basic design check |
Energy utilization and Integration | |
Professional equipment specification development and procurement | |
Equipment planning for engineering projects |
Project construction management (PCM) | |
EPC turnkey project |
Water Treatment Engineering
Water treatment projects, planning, design, construction, O&M | |
Industrial water treatment projects (cooling water system, pure water system, etc.), planning, design, construction, O&M | |
Urban sewage treatment and recycling projects, planning, design, construction, O&M | |
Industrial wastewater treatment and recycling projects, planning, design, construction, O&M | |
Variant water plant O&M | |
Water treatment facilities improvement, including physical-chemical treatment, biological treatment, membrane treatment, and sludge dehydration and drying treatment, etc. |
Water Treatment Chemicals
Boiler water system: tank cleaning agent, neutralizing amine, deoxidizer | |
Cooling water system: anti-corrosion and anti-scaling agent, dispersant, bactericide | |
Industrial wastewater system: coagulant, dispersant, polymer coagulant | |
Biochemical wastewater system: sludge bulking control, bio-antifoam chemicals, biological bacteria agent, biological synergist | |
Reclaimed water system: RO anti-scaling agent, bacteriostatic agent, membrane cleaning agent | |
Sludge system: drying agent, reducing agent, sludge bulking control agent | |
Others: neutral descaling agent, alkaline cleaning agent |
Civil Engineering
Geological drilling survey and evaluation | |
Construction permit application | |
Planning, design and construction of foundation, soil retaining and geological improvement |
Planning, design and construction of steel structure | |
Planning, design and construction of concrete structures | |
Project construction management, PCM |
Conveyor System Engineering
Basic design and detailed design of conveyor engineering | |
Design of belt Conveyor | |
Reclaimer planning, design | |
Transfer tower/steel structure design |
Analysis and design of the storage yard | |
Project construction management, PCM | |
EPC project |
Refractory Material Engineering
Coke oven construction supervision: methods and process planning, on-site management, quality supervision, guidance | |
Supply of refractory materials: feasibility study analysis, detailed design, material selection, procurement, quality control | |
Inspection: physical property test at room temperature (ISO、JIS、GB standards) | |
Technical services: analysis of refractory materials consumption and improvement solution |
Biotechnology and Pharmaceutical Plant Engineering
MEP Design | |
Procurement | |
Construction | |
Project management | |
Qualification & validation |
Other Maintenance and Overhaul Engineering
Sintering overhaul engineering | |
Main motor and steam turbine generator revamping and overhaul project | |
Steel plant maintenance |
Maintenance of mechanical equipment | |
Maintenance of electrical equipment | |
PV solar operation and maintenance |
Product Sales and Agency
LED lights: high bay lights, side lights, overhead crane lights, street lights, work lights, bulb lights, flat panel luminaire | |
LED lamp accessories: side light screws, high bay lights rings, stainless steel wire rope, crane suspension brackets, stainless steel lifting wire rope, work lamp brackets, lampshades, glass lenses | |
Air purifier | |
Bulhibitor | |
Anti-corrosion materials |